Skip to content

News

Wind turbine manufacturing and components

Bladt Industries is to fabricate Suction Bucket Jacket Foundation

The fabrication of the much talked-about Suction Bucket Jacket foundation is to be commenced soon. A foundation, which in many ways is a fusion of already known foundation types – over the seabed it is a jacket structure and under the seabed it is the well known bucket foundation concept that is a part of the future 1:1 prototype.

The foundation will end up weighing approximately 900 tonnes and have a height of 56 meters. Each of the three suction buckets will have a diameter of 8 meters and the span between the buckets will be 23 meters. The foundation is scheduled to be ready in the third quarter of 2014. The foundation will be installed at Borkum Riffgrund Offshore Wind Farm to which Bladt Industries is delivering the 77 monopile foundations.

For Bladt Industries, this is not the first time we are manufacturing innovative constructions. Most recently in 2011, we fabricated the Hornsea Twisted Jacket, which was shipped from Aalborg to its final destination in the UK.

You should consider reading

Wind turbine manufacturing and components

Solution

Digitalisation

+7

Floating Offshore Wind Solution Suite

2 April 2026
A US engineering firm sought to commercialise a floating offshore wind technology, requiring a clear market strategy, product-market fit, and access to capital to enable entry into competitive global markets.

Solution

Building design

+20

Renewables Focus with Port Development

2 April 2026
A European municipality sought to define a clear vision for transforming an industrial area into a hub for renewable energy manufacturing, while aligning stakeholders including municipal staff and elected officials.