Skip to content

Case

Buildings

Energy efficiency in buildings

Waste management

Waste-to-energy Plant – Shenzhen, China

20. September 2021

Solution provider

Gottlieb Paludan Architects

Great architecture evokes great passion. For us, this is the kind of architecture that contributes to solving the challenges we face today. The kind that creates sustainable development, vibrant and diverse cities, beautiful and future-proof structures as well as inviting urban spaces and landscapes for all to enjoy. Working out of our office in Copenhagen, we strive to create architecture that understands, connects and enriches the whole world. Together we create cohesion.

More from Gottlieb Paludan Architects

Want to see this solution first hand?

Add the case to your visit request and let us know that you are interested in visiting Denmark

Gottlieb Paludan Architects and Schmidt Hammer Lassen Architects won the international competition to design the world’s largest waste-to-energy plant.

Challenge

The new Shenzhen East Waste-to-Energy Plant will incinerate 5,000 tonnes of waste per day, corresponding to one third of the waste generated by Shenzhen’s 20 million inhabitants. The plant will utilize the most advanced technology in waste incineration and power generation and, at the same time, act as a source of education for the citizens of Shenzhen.

Design challenges

– Developing a unifying architectural concept for a very large and complex technical facility in a sensitive environment.

– Integrating heavy technical infrastructure with public access and education facilities.

Visualisation: Gottlieb Paludan Architects

Solution

The winning design organizes the entire plant, including auxiliary buildings, into one circular building – breaking with the traditional rectangular layout of technical facilities. By proposing a clear circular form the footprint of the plant is reduced. The 66,000 m² roof is designed to be covered by up to 44,000 m² of solar panels, providing the opportunity for the plant to produce even more energy for the city.

Result

The plant is intended to showcase waste-to-energy production as an important technical process that deals with the issues of growing amounts of waste as well as the issue of finding more environmentally friendly ways of generating power.

Client: Shenzhen Energy Environmental Engineering Ltd
Year: 2022-
Location: Shenzhen, China
In collaboration with: Schmidt Hammer Lassen Architects