Case

Offshore wind farm – Horns Rev 3

Sweco Architects has delivered a report with visualizations for the EIA of the off-shore wind farm Horns Rev 3. The report contains visualizations of different scenarios of installations with 42-136 off-shore turbines. In addition to the report, visualizations of several electrical-station plants including a high-voltage switchgear have been made.

The distance from the off-shore wind farm to the nearest point on the western coast is approximately 20 km. It will be possible to see the off-shore wind farm from the coast during clear weather conditions.

The Horns Rev 3 off-shore wind farm is being established with an effect of 400 MW.

The plant will be fully operational by 2020.

Did you like this solution?

Sweco Danmark
  • 30 Solutions
  • 25 News
Primary contact
Thomas Fleurine Sørensen
+45 4348 4622

Location

Looking for our logo?

Find it in the State of Green Toolbox together with loads of materials to help you promote Denmark’s green solutions abroad.
Visit toolbox