State of Green logo
Solution: Blade Dragon
Blade Dragon

Blade Dragon

Share

Liftra is setting a new standard in blade installation with the development of the Blade Dragon.

The remote controlled yoke handles blades in wind speeds up to 12 m/s for installation on the hub in all positions.

The Blade Dragon is developed to meet the requirements of blade installation on direct drive wind turbines.

Share this Solution
Liftra
Att: Per Fenger
Karlskogavej 12
9200 Aalborg SV
Denmark
Phone: +45 96 600 300
×

Thank you for signing up

You will receive a validation e-mail right away.

Close