State of Green logo
Solution: Blade Dragon
Blade Dragon

Blade Dragon

Liftra is setting a new standard in blade installation with the development of the Blade Dragon.

The remote controlled yoke handles blades in wind speeds up to 12 m/s for installation on the hub in all positions.

The Blade Dragon is developed to meet the requirements of blade installation on direct drive wind turbines.

Att: Per Fenger
Stationsmestervej 81
9200 Aalborg SV
Phone: +45 96 600 300

Contact Liftra

Fill out the fields and send your enquiry to Liftra. A copy of your message will be sent to State of Green, but all further correspondance will be private.

Thank you for signing up

You will receive a validation e-mail right away.